Having completed the detailed design for the Water Balance Pilot, the City of 1000 tanks prepared a lineout to facilitate pre-construction clarifications with the Little Flower Convent team. After a joint inspection of the footprint, position of components and circulation networks, minor changes were suggested by the Little Flower Convent team.